Combobulating

Release v0.1.0 — Phase 1 Submission Cut

Date: 2026-05-21 (target, end of Week 2 per plan.md §24). Cut for: Samsung EnnovateX 2026 Phase 1 Blueprint submission.

This release is the blueprint cut. It contains the documents, deck, and architecture commitments that go to the submission portal. No app binary ships at this version. The Phase 1 deliverable is the deck + repo state.


What’s in v0.1.0

Documentation pack (this directory)

Deck

Repo skeleton

Per plan.md §19 layout: apps/{ios,android,watch}/, agents/{core,comms,calendar,finance,wellness}/, orchestrator/, memory/, models/{lora,eval,exports}/, datasets/, pilot/, design/.


Architecture commitments locked in this release


What’s not in v0.1.0


Outstanding [TEAM TO VERIFY] items


Known limitations


Acknowledgements

Team Galaxy Brain — Shaurya Punj, Shorya Gupta — Thapar Institute of Engineering and Technology. No third member, no faculty mentor. Total budget ₹2,000.


End of v0.1.0 release notes.